Deltaspring Lending Group takes a contractor's request by phone or form and sends it to funding partners for review.
Builders and trade contractors in Smyrna, TN can request equipment financing for machines, a credit line for materials, or working capital for bid deposits and job start costs. Counts are Rutherford County, TN figures from County Business Patterns 2023 and Nonemployer Statistics 2024, plus a ZIP 37167 count; dollar examples are invented.
At a glance
- Construction employers, Rutherford County, TN
687 establishments (CBP 2023)
- Specialty trade contractors, Rutherford County, TN
479 employer establishments (CBP 2023)
- Specialty trade contractor payroll, Rutherford County, TN
$279.8 million (CBP 2023)
- Construction employers with a ZIP 37167 address
97 (ZBP 2023)
Builders, finishers and specialty trades in Rutherford County, TN, and the facts a Smyrna, TN contractor settles before a request
Of the 687 construction employers County Business Patterns counted in Rutherford County, TN for 2023, 186 were in construction of buildings, and 124 of those (66.7%) had fewer than five employees. Specialty trade contractors made up 479, with 4,391 paid employees and $279.8 million in annual payroll; 69 were electrical contractors and other wiring installation contractors.
Specialty trade contractors without employees are counted in a separate program: Nonemployer Statistics listed 3,005 in the county for 2024. On its own, ZIP 37167 had 97 construction employers in the 2023 ZIP Code Business Patterns data.
A contractor's request goes better with a few facts settled first:
- How many hours a year the machine would run, against the cost of renting it
- Whether the supplier wants payment at pickup or offers an account with terms
- When each bid deposit comes back if the bid is not awarded
- How often pay applications are submitted and how long they take to clear
Financing for contractors that puts a trencher and a boom lift on one Smyrna, TN schedule
Illustration only, invented figures: an electrical contractor buys a ride-on trencher for $38,500 and a used 45-foot boom lift for $64,000, $102,500 in all. On a five-year schedule at 9.6% a year, the trencher and lift cost the contractor $2,157.70 monthly and $129,462.00 across all 60 months, $26,962.00 of which is interest.
A funding partner may weigh the lift's age and hours when setting the term, and may offer different terms for the two machines. Rental hours logged on similar jobs help show whether owning the trencher costs less than renting it. The equipment financing page works a used dozer against a new one for an excavation crew.
A credit line for materials: financing for contractors whose supplier wants payment at pickup in Smyrna, TN
Illustration only, invented figures: a contractor's supplier wants payment at pickup until a trade account is opened. The crew picks up $12,600 of conduit and wire on day 0 and $8,900 more on day 14, and the progress payment that covers both clears on day 35. Drawing each amount on a line at an annual rate of 12% until that day costs about $206.44 in simple interest, plus any line fee.
A line of credit fits materials because each pickup is drawn separately and paid off when the owner pays. A partner may ask for the contract and the pay application schedule to size the limit.
Fixed payments for bid deposits? Financing for contractors in Rutherford County, TN, worked through
Illustration only, invented figures: a contractor bids three jobs, each asking for a $6,000 deposit, $18,000 in all. Covered by a 12-month fixed loan at 13% a year, the three deposits mean $1,607.71 a month and $1,292.52 of interest by month twelve.
Deposits come back, though. In this invented example, two bids are not awarded and their $12,000 returns on day 40; the third deposit returns on day 60 when the contract is signed. Drawn on a line at the same 13%, the interest would be about $299.18, because the balance ends when the money comes back. A fixed schedule keeps running after the deposits return.
A fixed loan can still suit a contractor who wants a set payment, and a working capital request can be sized to the deposits and the costs that follow a win.
Financing for contractors and the cash a won bid ties up before the first pay application in Smyrna, TN
Illustration only, invented figures: after a win, the contractor rents a mini excavator for $4,300, buys $16,800 of first materials and pays $2,150 for permits and a job trailer, $23,250 spent before the first pay application is submitted.
In this invented example, that $23,250 is the amount to plan for: a draw on a line, a short working capital loan or reserves. Listing those costs and the pay application date in the request gives a partner the full picture.
The Smyrna, TN page carries local business figures, and related trades such as landscaping and manufacturing are grouped on the industries page.
By Deltaspring Lending Group ยท Updated


